CONCRETE SLAB – PARRAMATTA LIGHT RAIL NSW

Through a unique combination of engineering, construction and design disciplines and expertise.​

Custom Concrete Slabs

Parramatta Light Rail Slabs

Slabs were 3.6m x 15m and 450mm thick

Project Overview

FinnBarr Construction were awarded two base slabs on the Parramatta Light Rail for Tallai Project Group located at:

1) Westmead North and North Parramatta Driver Facility

2) Camellia and Carlingford Driver Facility

Scope for the project included the following:

This was a straightforward project, completed over two weeks.
Each of the slabs were 3.6m x 15m and 450mm thick.
This required a blinding layer and edge boards to be placed prior to pouring 25m3 of concrete in each slab.